Industry · High-Voltage Electrical and Power Infrastructure

Be the HV contractor retrieved for the voltage and the connection.

Developers search for contractors who can build their connection at a stated voltage, with the right accreditation. We make your voltages, scopes and NERS accreditation explicit enough to be matched to those searches.

Apply for a free 15-minute consultation

The retrieval problem

Developers search by voltage. Sites list electrical services.

A battery storage developer needs a 33 kV substation and cable route built for adoption by the DNO. Most HV contractors list design, installation and maintenance on one page. The contractor retrieved is the one whose pages state the voltages, the contestable scope it can deliver and its NERS accreditation.

Buyer queries

The queries we model in this market.

Examples, one from each stage of a purchase. Your report models the full set for your services and your region.

Problem

Who can build a grid connection for a battery storage site?

Discovery

Independent connection providers for 33 kV substations in the UK

Comparison

Using an ICP vs the DNO for a contestable grid connection

Supplier selection

HV contractors providing senior authorised person cover

What has to be explicit

The facts systems need to match you to those queries.

  • Voltages you design, build and maintain (11 kV, 33 kV, 132 kV) stated separately
  • NERS accreditation scopes held, and adoption by which DNOs
  • Project types: solar, BESS, EV hubs, data centres, industrial sites
  • HV maintenance, authorised person and 24-hour response services
  • Regions covered and connection projects completed

Who we work with

  • Substations and grid connections
  • HV cabling and jointing
  • HV maintenance and authorised person services

Who decides

Renewable, battery storage and data centre developers, and industrial site engineers.

How it starts

From application to roadmap.

  1. 01

    Apply

    Answer six short questions about your business. We read every application.

  2. 02

    15-minute consultation

    Free. We show you two or three verified retrieval weaknesses in your market.

  3. 03

    Retrieval Opportunity Report

    A measured diagnosis of one service category, and a prioritised roadmap.

  4. 04

    Implementation

    The roadmap carried out, then re-tested against the same measures.

Common questions

Our customers find us through the DNO's list of ICPs.

That list names you; it does not say what you are good at. Developers search for the voltage and project type, and pick from who is retrieved.

Is our NERS accreditation enough to stand out?

Only if it is stated in text with its scopes. A logo in the footer cannot be matched to a query.

Free 15-minute consultation

Find out where your business stands.

  • How search and AI systems currently interpret your business
  • Where competitors are better understood than you
  • Specific retrieval weaknesses, checked before we speak
  • Whether there is work worth doing, and what it is worth to you

Apply for a free 15-minute consultation

We reply within one business day, and usually within the hour.